Power Out at ARRL Headquarters

07/31/2020

Power is out at ARRL Headquarters in Newington, Connecticut, due to the failure of a nearby power transformer. It is not known how long the outage will last.

HQ will have very limited call-answering capabilities. All member-facing systems are on natural gas generators, however, and will not be affected, unless the power situation worsens and HQ telecommunication providers are affected.

Personnel working at HQ may be sent home if the situation persists. 

Sumber www.arrl.org

Lihat Juga

WSJT-X version 2.4.0 Now Generally Available, Version 2.5.0 on the Horizon

06/10/2021 WSJT-X version 2.4.0 now is available in general release. According to co-developer Joe Taylor, …